On September 26, 2021, The complete set of barley processing equipment was loaded and shipped! This production line includes six containers. Under the orderly dispatch of relevant staff, the equipment is gradually loaded by forklifts. The loading was completed on the afternoon of the 27th and was successfully shipped to the Qingdao port.